http://mortbaytraders.com.au/wp-content/uploads/2017/06/powerboard-14090-1.jpg
http://mortbaytraders.com.au/wp-content/uploads/2017/06/powerboard-14090-2.jpg
http://mortbaytraders.com.au/wp-content/uploads/2017/06/powerboard-14090-3.jpg
http://mortbaytraders.com.au/wp-content/uploads/2017/06/powerboard-14090-4.jpg

4-Way Power Board with Individual Switches Extra Long Lead (5m)

Title:

Description:

4-Way Power Board with Individual Switches Extra Long Lead (5m)

Overview

RFI and EMI Protection, 2 spaced sockets, surge protection.

Surge and Overload Protection for for your TV, Video, Audio Systems and other appliances for Home or Office. Product does not offer protection against
direct lightning strikes.

Product is to be used INDOORS ONLY.

Features

  • Surge protection
  • Overload and circuit breaker protection
  • Circuit breaker with reset protection function
  • 10amp overload circuit breaker
  • RFI and EMI protection stops interference
  • 5m extra long power cord
  • 4 power sockets
  • 2 spaced sockets fits chargers & adaptors
  • Right angle plug
  • Slimline design
  • Individual on / off main power switches
  • Light indicator
  • Extra long power cord 5m

Technical Specifications

Power Supply Voltage: 240V ~ 50Hz
Measured Current Rate: 10A / 2400W
Surge Protection Level: 525J (Joules)
Surge Current: 4,500A
Overload Protection: Total load connected not to exceed 10 Amps
Clamp Voltage: <275V
Product Dimensions: 290 x 80 x 30mm
Product Code: 14090
Pack Sizing: 357 x 113mm
Inner Carton: 4
Master Carton: 24

 

Gallery

http://mortbaytraders.com.au/wp-content/uploads/2017/06/powerboard-14090-1-540x540.jpg
http://mortbaytraders.com.au/wp-content/uploads/2017/06/powerboard-14090-2-540x540.jpg
http://mortbaytraders.com.au/wp-content/uploads/2017/06/powerboard-14090-3-540x540.jpg
http://mortbaytraders.com.au/wp-content/uploads/2017/06/powerboard-14090-4-540x540.jpg